Good operating habits to extend the life of your equipment doubled
1, bucket transport height
★ illegal operation: with a high load arm walking loading, easy to cause the boom cylinder bending failure.
★ standard operation: the fighting state, the bottom of the bucket 40-50 cm off the ground, the slope to minimize.
2, the operation, should make the loader straight on the front, before and after the frame should be in a straight line.
3, prohibit the use of inertia high-speed plug into the pile, should rely on the driving force of the loader straight cut.
4, the bucket cut into the angle is too large, all the load added to the front axle, resulting in the rear wheel vacant, prone to the front axle from the original screw teeth, axle or even the front axle support shaft fracture and other failures.
5, prohibit the use of bucket corner digging hard materials, or prone to boom deformation, cylinder damage and other failures.
6, the bucket inserted into the pile, you should first fight and then start the arm, or will cause the boom deformation.
7, with a high load arm walking loading, easy to cause the boom cylinder bending failure.
8, can not be carried out in the high digging operations or bucket bump material, so as not to arm arm cylinder bending.
9, after discharge, should first stop or part of the resumption of operation and then move the arm, otherwise it will cause "pull the cylinder", damage dump tank.
10, the bucket of the block by a long time due to deformation caused by deformation, wear, the timely repair welding to ensure that the bucket of the block in the normal bar, the discharge position to play an effective limit role.
★ If the limit block wear is not timely repair welding, will cause rocker deformation, fracture failure!
11, wading operations, the water does not exceed the drive axle or gearbox output shaft seal the lowest parts.
12, cabin, underground operating conditions, the engine to be installed tail gas treatment device.
|